Kicking Horse Dam Safety Upgrades
Kicking Horse Dam and outlet works was constructed in 1930 along with two dikes. Through an Issue Evaluation level risk analysis that was performed evaluating baseline static, hydrologic, and seismic risks posed by potential failure modes, certain risks have been identified for Kicking Horse Dam resulting in increased justification to take risk reduction action. The safety upgrades will modify and/or replace the aging infrastructure to current industry standards, including hydrology, hydraulics, structural, mechanical, geotechnical, and seismic. This includes installation of a cement bentonite cutoff wall along the entire length of the dam, removal and replacement of the existing outlet works, toe drain installation, realignment of the G-Canal Lateral, replacement of the downstream check structure, and raising low spots in the dam crest. Design is currently in a final design phase. Extensive measures have been and will continue to avoid, minimize, or mitigate impacts of construction on the wetlands and native prairies located on the site.
Explore project →